Crusoe
ПровереноРаботаетVertically integrated AI cloud building its own power-first data center campuses
От
—
GPU от
126 ₽/GPU-час
Локации
5
стран
Дата-центры
13
площадок
Сети (ASN)
1
ASN
Тарифы и цены
5
тарифов
Обзор
Crusoe develops AI data center campuses sited around available (often stranded or renewable) power and rents NVIDIA GB200, B200, H200 and H100 plus AMD MI300X/MI355X capacity through Crusoe Cloud, alongside managed inference. It began in 2018 by powering bitcoin mining with flared gas and sold that mining business to NYDIG in 2025.
Тарифы и цены
GPU-инстансы5
| Instance | Конфигурация | за GPU-час | Всего /час | Spot | Локации | Источник |
|---|---|---|---|---|---|---|
crusoe_L40Sx2 16 vCPU · 294 GB RAM | 2× L40S48 GB | 126 ₽ | 252 ₽ | — | skypilot 4 дн. назад | |
crusoe_L40Sx4 32 vCPU · 588 GB RAM | 4× L40S48 GB | 126 ₽ | 504 ₽ | — | skypilot 21 ч назад | |
crusoe_L40Sx8 64 vCPU · 1176 GB RAM | 8× L40S48 GB | 126 ₽ | 1 007 ₽ | — | skypilot 21 ч назад | |
crusoe_A100-80GB 12 vCPU · 120 GB RAM | 1× A100 80GB80 GB | 168 ₽ | 168 ₽ | — | skypilot 4 дн. назад | |
crusoe_A100-80GBx2 24 vCPU · 240 GB RAM | 2× A100 80GB80 GB | 168 ₽ | 336 ₽ | — | skypilot 15 ч назад |
Модели GPU
Последние измененияВсе изменения →
четверг, 15 октября 2026 г.
3 измененийсреда, 14 октября 2026 г.
4 измененийвторник, 13 октября 2026 г.
4 измененийпонедельник, 12 октября 2026 г.
1 измененийДата-центры · 13
Equinix LD5 - London, SloughSlough
Equinix DB3 - Dublin, BallycoolinDublin
ICE02Reykjanesbæ
Equinix AM7 - Amsterdam, KuiperberwegAmsterdam
Digital Realty HOU (12001 North Freeway)Houston
Equinix CH1/CH2/CH4 - ChicagoChicago
Equinix CU1/CU2/CU3/CU4 - CulpeperCulpeper
Equinix DA11 - DallasDallas
Equinix DA6 - DallasDallas
Equinix DC1-DC15,DC21-DC22 - AshburnAshburn
Equinix DE2 - DenverDenver
Equinix SE2/SE3 - SeattleSeattle
Equinix SV1/SV5/SV10 - Silicon Valley, San JoseSan Jose